From Concept to Commissioning

TURNKEY FACTORY SOLUTIONS

We provide end-to-end industrial ecosystems for entrepreneurs and global enterprises entering the plastic packaging market.

THE 6-STEP IMPLEMENTATION

A proven methodology ensuring your production line is profitable from day one.

01
Phase One

Strategic Market Feasibility

Detailed analysis of your target market's cup size demand, material preferences (PET/PP/PLA), and production volume requirements.

02
Phase Two

Bespoke Workshop Engineering

Complete workshop layout design including electrical load calculations, pneumatic piping paths, and cooling system integration.

03
Phase Three

Precision Custom Manufacturing

Fabrication of your specialized machinery and high-precision molds in our modern manufacturing center.

04
Phase Four

In-House FAT Testing

Factory Acceptance Testing (FAT) with your raw materials to ensure speed and quality benchmarks are met before shipment.

05
Phase Five

Logistics & On-Site Startup

Global logistics management followed by our engineering team's physical presence at your site for installation and commissioning.

06
Phase Six

Operator Certification & Support

Intensive training program for your local staff on operation, mold changes, and daily maintenance procedures.

FACILITY SPECIFICATIONS

Standard infrastructure requirements for a high-capacity production center.

Production Area

Minimum 200-300 sqm for a single line including material handling zones.

Power Load

Stable 3-Phase 380V/440V. Average installed power 80-120KW per full line.

Cooling System

Centralized water chiller or cooling tower with 15k-30k kcal/h capacity.