TURNKEY FACTORY SOLUTIONS
We provide end-to-end industrial ecosystems for entrepreneurs and global enterprises entering the plastic packaging market.
THE 6-STEP IMPLEMENTATION
A proven methodology ensuring your production line is profitable from day one.
Strategic Market Feasibility
Detailed analysis of your target market's cup size demand, material preferences (PET/PP/PLA), and production volume requirements.
Bespoke Workshop Engineering
Complete workshop layout design including electrical load calculations, pneumatic piping paths, and cooling system integration.
Precision Custom Manufacturing
Fabrication of your specialized machinery and high-precision molds in our modern manufacturing center.
In-House FAT Testing
Factory Acceptance Testing (FAT) with your raw materials to ensure speed and quality benchmarks are met before shipment.
Logistics & On-Site Startup
Global logistics management followed by our engineering team's physical presence at your site for installation and commissioning.
Operator Certification & Support
Intensive training program for your local staff on operation, mold changes, and daily maintenance procedures.
FACILITY SPECIFICATIONS
Standard infrastructure requirements for a high-capacity production center.
Production Area
Minimum 200-300 sqm for a single line including material handling zones.
Power Load
Stable 3-Phase 380V/440V. Average installed power 80-120KW per full line.
Cooling System
Centralized water chiller or cooling tower with 15k-30k kcal/h capacity.